KATY TX'S #1 PERMIT & PROJECT MANAGEMENT EXPERTS

Stop Permit Delays & Get City Approvals FAST - 98% First-Time Approval Rate

Building permits. Trade permits. Zoning approvals. Fire marshal sign-offs. Certificate of occupancy. We handle ALL permits & city coordination. 250+ permits processed. Direct city relationships. 3 weeks faster than average. Zero permit rejections in 2024.

250+
Permits Processed
98%
First-Time Approval
3 Weeks
Faster Approvals
Licensed Contractor | Direct City Relationships | Zero Rejections 2024

Proven Permit Success Track Record

Real numbers from real projects in Greater Houston and Greater Houston

0
Permits Processed

Building, trade, zoning approvals

0
%
First-Time Approval Rate

vs. 67% industry average

0
Weeks
Faster Than Average

Average 4-6 weeks vs. 7-9 weeks

0
Permit Rejections in 2024

Perfect submission record

Complete Permit Services

All Permit Types We Handle

From building permits to certificates of occupancy - we handle every permit type for your construction project

Building Permits & Plan Review

Complete building permit services for commercial renovations, new construction, and structural modifications

  • Architectural plan review & submission
  • Structural engineering coordination
  • Building department liaison
  • Plan corrections & resubmissions
  • Permit acquisition & posting
  • Ongoing permit amendments
Typical Timeline: 4-6 weeks

Trade Permits (Electrical, Plumbing, Mechanical)

All specialty trade permits for electrical work, plumbing systems, HVAC installations, and mechanical equipment

  • Electrical permit applications
  • Plumbing permit submissions
  • HVAC mechanical permits
  • Gas line permit coordination
  • Licensed contractor verification
  • Multi-trade permit bundling
Typical Timeline: 2-3 weeks

Zoning & Variance Applications

Zoning compliance verification, variance requests, and special use permit applications for commercial properties

  • Zoning code compliance review
  • Variance application preparation
  • Special use permit requests
  • Board of adjustments representation
  • Site plan approval coordination
  • Neighborhood notification handling
Typical Timeline: 6-12 weeks

Fire Marshal Approvals & Life Safety

Fire safety plan reviews, sprinkler permits, fire alarm systems, and emergency egress approvals

  • Fire sprinkler system permits
  • Fire alarm installation approvals
  • Emergency exit plan reviews
  • Occupancy load calculations
  • Fire marshal inspection scheduling
  • Life safety code compliance
Typical Timeline: 3-5 weeks

Re-inspection Coordination & Scheduling

Inspection scheduling, correction coordination, and re-inspection management for all permit types

  • Initial inspection scheduling
  • Inspector notes review & corrections
  • Rapid correction implementation
  • Re-inspection coordination
  • Final approval documentation
  • Inspection failure prevention
Response: 24-48 hours

Certificate of Occupancy Processing

Complete CO application, final inspection coordination, and certificate acquisition for building occupancy

  • CO application preparation
  • Final inspection walkthrough scheduling
  • Punch list completion coordination
  • All trades sign-off verification
  • CO issuance & documentation
  • Temporary CO for early occupancy
Typical Timeline: 1-2 weeks

Permit Amendments & Modifications

Mid-project plan changes, permit amendments, and modification approvals without delays or rejections

  • Scope change documentation
  • Revised plan submissions
  • Additional permit applications
  • Value engineering approvals
  • As-built documentation updates
  • No-delay amendment processing
Typical Timeline: 1-3 weeks
Step-by-Step Process

Your Permit Approval Journey

Visual timeline showing exactly what happens from initial consultation to final permit approval

Day 1-2

1. Initial Consultation & Plan Review

We review your project scope, analyze permit requirements, and develop a complete permit strategy tailored to your timeline.

  • Project scope analysis
  • Code requirement assessment
  • Timeline & cost estimate
Day 3-7

2. Document Preparation & Plan Compilation

We gather all required documents, coordinate with engineers if needed, and prepare complete permit application packages.

  • Engineering coordination
  • Document compilation
  • Application preparation
Day 8-10

3. Permit Submission & City Coordination

In-person permit submission at city building department with direct handoff to plan review team for fastest processing.

  • In-person submission
  • Direct examiner contact
  • Priority review request
Week 2-4

4. Plan Review & Corrections

Daily city follow-up, immediate response to any correction requests, and same-day resubmissions to prevent delays.

  • Daily status checks
  • Rapid corrections
  • Same-day resubmissions
Week 4-6

5. Permit Approval & Issuance

Final approval from all departments, permit issuance, and delivery of official permit documents ready for posting.

  • Final approval obtained
  • Permit fees paid
  • Permit documents delivered
Ongoing

6. Inspection Coordination & Project Support

We continue managing all inspections, coordinate corrections if needed, and ensure smooth path to certificate of occupancy.

  • Inspection scheduling
  • Inspector coordination
  • Final CO acquisition

Want to cut this timeline in HALF?

Ask about our EXPRESS PERMIT EXPEDITING service - Get approvals in 1-3 weeks instead of 4-6 weeks!

Our City Relationships

Direct City Department Contacts = Faster Approvals

We have established professional relationships with building departments across Greater Houston. This means your permits get processed faster, corrections happen quicker, and approvals are streamlined.

Direct Examiner Access

We know the plan review examiners personally - get direct answers instead of waiting days for callbacks

Priority Processing Requests

Established relationships mean we can request and often get priority plan review for urgent projects

Same-Day Corrections

When plan review notes come back, we can often correct and resubmit same day instead of waiting weeks

Multi-Jurisdiction Experience

Katy, Houston, Sugar Land, Pearland, Cypress, Spring - We know requirements for all Greater Houston cities

Cities We Serve:
Greater Houston Houston, TX Sugar Land Pearland Cypress Spring Tomball Richmond
City Building Department
250+
Permits Processed
15+
Years Experience
8
Cities Served
Success Stories

Real Permit Approvals from Real Projects

See how we've helped property owners, developers, and contractors get permits approved quickly

Office Building Renovation
COMMERCIAL

42,000 Sq Ft Office Building - Full Renovation Permit

Greater Houston 4 Weeks to Approval First-Time Approval

Challenge: Developer needed complete building permit for major office renovation including structural modifications, new HVAC system, complete electrical upgrade, and ADA compliance improvements. Timeline was critical - had tenant ready to sign lease contingent on permit approval.

Our Solution: Coordinated with structural engineer for expedited calculations, prepared comprehensive permit package with all trade permits bundled, submitted in-person with direct handoff to senior plan examiner, followed up daily during 3-week plan review process.

Result: Permit approved in 4 weeks (vs. typical 8-10 weeks). Zero plan corrections required. All trade permits issued simultaneously. Tenant signed lease, construction started on schedule, building fully occupied within 6 months.

$2.8M
Project Value
6
Permits Obtained
50%
Time Saved

128-Unit Multifamily Property - Emergency Fire System Permit

Houston, TX 10 Days to Approval Expedited Service

Challenge: Fire marshal red-tagged property due to failed fire sprinkler system inspection. Property manager needed emergency permit for complete fire sprinkler replacement across entire 128-unit complex. No certificate of occupancy until resolved - potential $5,000/day fines and tenant relocations.

Our Solution: Immediately contacted fire marshal's office to explain emergency situation. Coordinated overnight with fire sprinkler contractor and engineer. Submitted emergency permit application with expedited review request. Scheduled daily in-person meetings with fire marshal during review period.

Result: Emergency fire sprinkler permit approved in 10 days (vs. typical 4-6 weeks). Work completed in 3 weeks. Final fire marshal inspection passed first time. Certificate of occupancy restored. Property avoided $150K+ in daily fines and prevented tenant relocations.

$850K
Project Cost
$150K+
Fines Avoided
75%
Time Saved
Multifamily Building
EMERGENCY
Retail Store
RETAIL

25,000 Sq Ft Retail Store - Tenant Improvement Permit Package

Sugar Land, TX 3 Weeks to Approval All Permits Bundled

Challenge: National retail chain needed tenant improvement permits for new store location. Complex project included new storefront, extensive electrical work for displays, commercial kitchen for café, ADA restrooms, and fire suppression system. Lease penalties if store didn't open by Black Friday.

Our Solution: Managed complete permit coordination - building, electrical, plumbing, mechanical, hood suppression, fire alarm, and sign permits. Created master timeline with critical path tracking. Coordinated with 6 different subcontractors for permit-ready drawings. Submitted all permits simultaneously.

Result: All 7 permits approved within 3 weeks. Inspections scheduled strategically to minimize delays. Store opened 2 weeks before Black Friday. Avoided $50K lease penalties. National retailer now uses us for all Houston-area locations.

$1.2M
Build-Out Cost
7
Permits Bundled
$50K
Penalties Avoided

Medical Office Building - Complex Zoning & Building Permits

Pearland, TX 8 Weeks to Full Approval Variance Approved

Challenge: Medical practice group wanted to build new 15,000 sq ft medical office building on previously residential-zoned land. Needed zoning variance, special use permit for medical office in transitional zone, and complete building permit package. City planning commission initially denied variance request.

Our Solution: Prepared comprehensive variance application with traffic study, parking analysis, and neighborhood impact report. Attended planning commission hearing with detailed presentation. Coordinated with city planner on revised site plan. Once zoning approved, expedited building permit submittal with medical-grade mechanical and plumbing plans.

Result: Variance approved on second submission (6 weeks). Building permit approved 2 weeks later. Medical office opened 10 months after land purchase. Practice now serves 200+ patients daily. Property value increased 300% with commercial zoning.

$3.5M
Project Value
300%
Value Increase
9
Total Permits
Medical Office
MEDICAL
Restaurant Kitchen
RESTAURANT

Commercial Restaurant - Kitchen Hood & Gas Permit Emergency

Cypress, TX 5 Days to Approval Fire Marshal Priority

Challenge: Restaurant owner failed final fire marshal inspection due to improperly installed kitchen hood suppression system. Grand opening scheduled in 2 weeks with $20K catering deposits at risk. Needed new hood system design, fire suppression permit, gas line permit, and mechanical permit - all before re-inspection.

Our Solution: Called emergency meeting with fire marshal to review deficiencies. Hired commercial kitchen engineer for same-day redesign. Submitted emergency permits with express review request. Coordinated with hood installer to begin work before permits approved (at contractor's risk). Scheduled final fire marshal inspection before work fully complete.

Result: All emergency permits approved in 5 days. Hood system redesigned and installed in 8 days. Fire marshal re-inspection passed. Certificate of occupancy issued 1 day before grand opening. Restaurant opened on schedule. $20K in deposits saved. Owner catered 300-person grand opening event successfully.

$85K
Correction Cost
$20K
Deposits Saved
90%
Time Saved
Client Testimonials

What Property Owners Say About Our Permit Services

Real feedback from real clients who trusted us with their permit approvals in Greater Houston and Greater Houston

"TELL PROJECTS saved our office renovation project. We were facing an 8-10 week permit timeline that would have killed our tenant lease deal. They got our building permit approved in 4 weeks with zero corrections. Their direct relationships with city examiners made all the difference. The tenant signed, we started construction on schedule, and the building is now fully leased. Worth every penny."

Michael Chen
Michael Chen

Commercial Property Developer

42,000 SF Office - Greater Houston

"We had a fire marshal emergency on our 128-unit property - red tag, daily fines, potential tenant relocations. TELL PROJECTS got us an emergency fire sprinkler permit in 10 days instead of the typical 4-6 weeks. They coordinated directly with the fire marshal's office and had daily in-person meetings. Saved us $150K+ in fines and prevented a disaster. They're now our go-to for all permit work."

Sarah Williams
Sarah Williams

Multifamily Property Manager

128-Unit Complex - Houston, TX

"Opening a national retail store with a Black Friday deadline is stressful enough without permit delays. TELL PROJECTS handled 7 different permits - building, electrical, plumbing, mechanical, hood suppression, fire alarm, and signage - and got ALL approved in 3 weeks. They coordinated with all our subcontractors and created a master timeline. Store opened 2 weeks early. No penalties. Corporate now uses them for all Houston locations."

David Rodriguez
David Rodriguez

Retail Development Manager

25,000 SF Store - Sugar Land, TX

"We wanted to build a new medical office but the land was residential-zoned. City planning initially denied our variance request. TELL PROJECTS prepared a comprehensive application with traffic studies and neighborhood impact analysis, represented us at the planning commission hearing, and got the variance approved on the second try. Then they expedited our building permit in 2 weeks. Medical office is now open and serving 200+ patients daily."

Dr. Jennifer Park
Dr. Jennifer Park

Medical Practice Owner

15,000 SF Medical - Pearland, TX

"Failed fire marshal inspection 2 weeks before our restaurant grand opening with $20K in catering deposits on the line. TELL PROJECTS got emergency hood suppression, gas line, and mechanical permits approved in 5 DAYS. They called an emergency meeting with the fire marshal, hired an engineer for same-day redesign, and got us re-inspected before the grand opening. Restaurant opened on time. 300-person event was a success. Absolute lifesavers."

Tony Martinez
Tony Martinez

Restaurant Owner

Commercial Kitchen - Cypress, TX

Your Success Story Could Be Next

Join 250+ property owners and developers who trusted us with their permit approvals

98% First-Time Approval
3 Weeks Faster Timeline
Zero Rejections 2024
Get Your Permit Quote

Or call: (832) 591-7991

Transparent Pricing

Clear, Upfront Permit Service Pricing

No hidden fees. No surprises. Just honest pricing for professional permit handling services.

Basic Permit Service

Single Permit Processing
Starting at
$1,500 - $5,000
Per permit application
Best For: Single trade permits, simple renovations, straightforward projects
  • Single permit application (electrical, plumbing, or mechanical)
  • Plan review & submission to city building department
  • Document preparation and compilation
  • City department liaison during review process
  • One round of corrections if needed
  • Permit acquisition and delivery
  • Basic inspection scheduling coordination
  • Email updates on permit status
Typical Timeline: 6-8 weeks
Common Projects:
  • • Single trade permits (electrical/plumbing)
  • • Minor interior renovations
  • • Small equipment installations
Request Quote

Express Expediting Service

Fastest Approval Possible
Starting at
$15,000 - $50,000+
Rush service premium
Best For: Emergency permits, urgent timelines, high-value projects
  • EVERYTHING in Professional Package PLUS:
  • Express priority review requests with city
  • Daily in-person visits to building department
  • Direct examiner relationships for fastest processing
  • Same-day plan corrections when review notes arrive
  • Immediate resubmissions (often within hours)
  • Emergency engineer coordination 24/7 availability
  • Expedited inspection scheduling with direct inspector contact
  • Dedicated project manager assigned exclusively
  • 24/7 phone support including nights/weekends
  • Real-time updates multiple times daily
  • Guaranteed fastest timeline or partial refund
Express Timeline: 1-3 weeks
Common Situations:
  • • Emergency red tag situations
  • • Time-sensitive lease obligations
  • • Major project deadlines
  • • High-value commercial deals
Call for Express Service
Frequently Asked Questions

Permit Questions Answered

Get answers to the most common questions about permit handling, timelines, costs, and city requirements

How long does the permit approval process typically take?

Permit timelines vary significantly based on project complexity, permit type, and city workload. Here's what to expect:

  • Single trade permits (electrical, plumbing): 2-4 weeks typical, as fast as 1 week with expediting
  • Building permits (minor renovations): 4-6 weeks typical, 2-3 weeks with expediting
  • Major commercial permits: 6-10 weeks typical, 3-5 weeks with expediting
  • Complex projects with variances: 8-16 weeks typical, depending on planning commission schedule

Our average approval time is 3 weeks faster than the city average due to our direct relationships with building departments, same-day corrections, and professional submission packages. With our Express Expediting Service, we can often cut timelines in half.

How much do permit services cost, and what determines the price?

Our permit handling services range from $1,500 to $50,000+ depending on several factors:

  • Number of permits required: Single trade permit vs. full building permit package (building + electrical + plumbing + mechanical + fire)
  • Project complexity: Simple renovation vs. major structural changes requiring engineering
  • Square footage: Larger projects require more extensive plan review and documentation
  • Timeline urgency: Standard processing vs. expedited service with daily city follow-up
  • Jurisdiction: Some cities have more complex requirements than others
  • Engineering coordination: Whether structural or MEP engineering is required

Most of our commercial renovation projects fall in the $5,000-$15,000 range for complete permit coordination. We provide free quotes within 24 hours of reviewing your project scope. All pricing is transparent with no hidden fees.

What documents do I need to provide to start the permit process?

The required documents vary by permit type, but here's what's typically needed:

For Building Permits:
  • Architectural plans (floor plans, elevations, cross-sections)
  • Structural calculations (if structural changes involved)
  • MEP drawings (mechanical, electrical, plumbing)
  • Property survey showing existing structures
  • Proof of ownership (deed or lease agreement)
  • Contractor license information
For Trade Permits:
  • Scope of work description
  • Equipment specifications (HVAC, electrical panels, etc.)
  • Load calculations (electrical/mechanical)
  • Licensed contractor information

Don't have complete plans? We can help! We coordinate with engineers and architects to develop permit-ready plans. We'll provide you with a complete checklist customized to your specific project during our initial consultation.

What happens if the city requires corrections to our plans?

Plan corrections are common - even on well-prepared submissions. Here's how we handle them:

  1. Immediate notification: We check permit status daily and get correction notes as soon as they're available
  2. Expert review: We analyze the correction requests and determine the fastest path to compliance
  3. Rapid response: We coordinate with your engineer/architect to make required changes immediately
  4. Same-day resubmission: In many cases, we can correct and resubmit plans the same day we receive notes
  5. Direct examiner contact: We often call the plan examiner directly to clarify requirements before resubmitting

Our 98% first-time approval rate means most projects don't need corrections. When they do occur, our Professional and Express packages include unlimited corrections at no additional cost. This is where our experience really shows - we know exactly what city examiners are looking for and can resolve issues quickly.

Can you expedite an emergency permit for a red-tagged property?

Yes! Emergency permits are one of our specialties. If your property has been red-tagged by code enforcement or the fire marshal, time is critical to avoid daily fines and tenant displacement.

Our Emergency Permit Process:
  • Immediate response: We can start work within hours of your call
  • Direct city contact: We contact the issuing inspector and department head immediately
  • Emergency permit requests: We submit formal emergency permit applications with expedited review requests
  • Daily in-person visits: We visit the building department daily to push the permit through
  • 24/7 engineering coordination: We have engineers on call for immediate plan preparation
  • Same-day corrections: Any plan review notes are addressed within hours, not days

Real example: We recently got emergency fire sprinkler permits approved in 10 days for a 128-unit property (vs. typical 4-6 weeks), saving the owner $150K+ in daily fines. For emergency situations, call us directly at (832) 591-7991 for immediate assistance.

Do you handle permits in all Greater Houston cities?

Yes! We process permits throughout Greater Houston and have established relationships with building departments in multiple jurisdictions.

Cities We Serve:
  • Greater Houston - Our primary market with the strongest city relationships
  • Houston, TX - All districts including downtown, uptown, and suburban areas
  • Sugar Land - Extensive experience with Fort Bend County requirements
  • Pearland - Regular permit processing including planning commission experience
  • Cypress - Familiar with both incorporated and unincorporated areas
  • Spring - Harris County permitting expertise
  • Tomball - City and ETJ permit experience
  • Richmond - Fort Bend County jurisdiction

Each city has different code requirements, submittal processes, and review timelines. Our multi-jurisdiction experience means we know these differences and can navigate each city's unique requirements efficiently. We also handle county permits for unincorporated areas in Harris and Fort Bend counties.

What is your first-time approval rate and how do you achieve it?

We maintain a 98% first-time approval rate compared to the industry average of 60-70%. Here's how we achieve this exceptional rate:

Pre-Submission Quality Control:
  • Comprehensive plan review: We review all plans thoroughly before submission to catch errors
  • Code compliance check: We verify all work complies with current building codes
  • Completeness verification: We ensure all required documents, calculations, and details are included
  • Format compliance: We make sure plans meet city formatting and scale requirements
Professional Relationships:
  • Direct examiner contact: We know plan examiners personally and understand their specific requirements
  • Pre-submission consultations: We sometimes review plans with examiners before formal submission
  • Track record: Building departments trust our submissions because of our consistent quality

Zero permit rejections in 2024! This saves our clients weeks of delays and thousands in potential holding costs, contractor standby time, and project delays.

Do you coordinate inspections and handle re-inspections if needed?

Yes! Complete inspection coordination is included in all our Professional and Express packages. Here's what we handle:

Inspection Services:
  • Inspection scheduling: We schedule all required inspections at the optimal time in your construction sequence
  • Inspector coordination: We communicate directly with inspectors about project status and any special considerations
  • On-site representation: We can be present for inspections to answer inspector questions
  • Results tracking: We monitor all inspection results and provide immediate notifications
Re-Inspection Management:
  • Failure analysis: If an inspection fails, we review the inspector's notes to understand exactly what needs correction
  • Correction coordination: We work with your contractors to ensure corrections are completed properly
  • Rapid re-inspection: We schedule re-inspections as soon as corrections are complete (typically 24-48 hours)
  • Inspector relationship: Our existing relationships help ensure fair inspections and clear communication

Common inspections we coordinate: foundation, framing, rough plumbing, rough electrical, rough mechanical, insulation, fire sprinkler, fire alarm, final building, and final CO inspection.

What if my project requires a zoning variance or special use permit?

We handle all zoning matters including variances, special use permits, and planning commission applications. Zoning approvals are more complex than standard permits and typically take 6-16 weeks depending on the city's planning commission schedule.

Zoning & Variance Services:
  • Zoning compliance analysis: We review your project against current zoning codes to identify required variances
  • Variance application preparation: We prepare comprehensive applications with supporting documentation
  • Technical studies: We coordinate traffic studies, parking analysis, environmental impact reports as needed
  • Neighborhood notification: We handle required notifications to adjacent property owners
  • Planning commission representation: We attend hearings and present your case to the planning commission
  • Conditional use permits: We prepare SUP applications for uses requiring special approval

Success story: We recently got a medical office zoning variance approved on the second submission after the initial denial. The variance request included a comprehensive traffic study and neighborhood impact analysis, and we represented the client at the planning commission hearing. Property value increased 300% with commercial zoning approval.

How much do city permit fees cost, and who pays them?

City permit fees are separate from our service fees and vary significantly based on project scope and valuation. Here are typical ranges:

Typical City Permit Fees (Greater Houston):
  • Electrical permit: $150-$1,000 depending on service size and work scope
  • Plumbing permit: $150-$800 depending on fixture count and work scope
  • Mechanical permit: $150-$1,200 depending on equipment size
  • Building permit: $0.50-$1.50 per square foot typically, calculated on project valuation
  • Fire sprinkler permit: $300-$2,000 depending on system size
  • Sign permit: $100-$500 depending on sign size

Example: A 10,000 sq ft commercial renovation with $500K construction value might have $5,000-$8,000 in total city permit fees (building + electrical + plumbing + mechanical + fire).

Payment Process:

We typically pay permit fees on your behalf when permits are issued, then invoice you for reimbursement. This ensures immediate permit issuance without delays. All permit fees are passed through at cost with zero markup. We provide itemized receipts from the city for all permit fees paid.

Can you help with Certificate of Occupancy (CO) applications?

Absolutely! Certificate of Occupancy processing is a core part of our service. The CO is the final step that allows you to legally occupy your building, and we handle the entire process.

CO Services Include:
  • CO application preparation: We complete all required applications and documentation
  • Final inspection coordination: We schedule the final building inspection and ensure all work is complete
  • Punch list management: We coordinate completion of any remaining items identified during final inspection
  • All trades sign-off: We verify that all trade inspections (electrical, plumbing, mechanical, fire) have been completed and approved
  • Fire marshal final approval: We coordinate final fire marshal inspection if required
  • CO issuance tracking: We monitor CO processing and ensure it's issued promptly
  • Temporary CO: If needed, we can often obtain a temporary CO for early occupancy while minor items are completed

Timeline: CO processing typically takes 1-2 weeks after final inspection passes. With our coordination, most projects pass final inspection on the first try, avoiding delays. The CO is critical - you cannot legally occupy your building without it, and many insurance policies won't activate until the CO is issued.

What happens if we need to make changes to our project mid-construction?

Mid-project changes are common! We handle all permit amendments, modifications, and change orders without delaying your construction schedule.

Permit Amendment Process:
  • Change documentation: We document the scope change and determine if a permit amendment is required
  • Revised plans: We coordinate with your engineer/architect to prepare revised drawings showing changes
  • Amendment submission: We submit permit amendments to the city with detailed change descriptions
  • Expedited processing: We request expedited amendment review to minimize construction delays
  • Additional permits: If the change requires new permits (e.g., adding a generator requires electrical permit), we handle those too
Common Changes We Handle:
  • Layout modifications (moving walls, changing room configurations)
  • Electrical changes (additional circuits, upgraded service)
  • Plumbing changes (fixture relocations, additional fixtures)
  • HVAC changes (equipment upgrades, ductwork modifications)
  • Structural changes (beam modifications, load path changes)

Timeline: Most permit amendments are approved in 1-3 weeks. Our goal is to process amendments quickly so your construction can continue with minimal delays. All our Professional and Express packages include amendment processing at no additional charge.

Do you work with contractors, or can property owners hire you directly?

Both! We work with contractors, property owners, developers, property managers, and architects. Our permit services are designed to fit any project structure.

Client Types We Serve:
  • Property Owners: Commercial building owners and multifamily property owners who want direct control over the permit process
  • Property Managers: Management companies handling permits for multiple properties
  • Developers: Real estate developers needing permit services for new construction or major renovations
  • General Contractors: GCs who want to subcontract permit processing to experts
  • Architects & Engineers: Design professionals who want to offer permit processing as an add-on service
  • Real Estate Investors: Investors flipping commercial properties or upgrading rental properties
Coordination Models:
  • Owner-direct: We work directly for the property owner and coordinate with their selected contractors
  • Contractor-led: We work as a subcontractor to the general contractor, providing permit expertise
  • Design-build: We coordinate with both design and construction teams as a neutral permit expeditor

No matter the structure, our goal is the same: get your permits approved quickly with zero rejections. We adapt our communication and coordination style to fit your project's organizational structure.

What sets TELL PROJECTS apart from other permit expeditors?

Great question! Here's what makes us different from other permit services in the Houston area:

Our Competitive Advantages:
  • We're actual contractors: Unlike permit-only expeditors, we're a full-service general contractor. This means we understand construction sequences, code requirements, and practical implementation.
  • 15+ years local experience: We've been working in Katy and Greater Houston for over 15 years. We know the local building departments, inspectors, and code requirements intimately.
  • 98% first-time approval rate: Our approval rate is 30% higher than industry average. This saves time and money.
  • Zero rejections in 2024: We haven't had a single permit rejection this year - a testament to our submission quality.
  • 3 weeks faster than average: Our direct city relationships and professional submissions consistently result in faster approvals.
  • Full-service support: We can also perform the actual construction work if desired, making us a true one-stop shop.
  • Emergency response capability: We've handled multiple emergency permit situations, getting approvals in days instead of weeks.
  • Engineering coordination: We have established relationships with structural and MEP engineers who can respond quickly.

Bottom line: We're not just permit pushers - we're construction professionals who understand your entire project and can navigate the permit process with expertise that comes from actually building projects for 15+ years.

How do I get started? What's the next step?

Getting started is easy! Here's the simple 3-step process:

Step 1: Initial Contact
  • Call us: (832) 591-7991 - we answer 7 days a week
  • Fill out the form below: We'll respond within 4 hours during business hours
  • Email us: Send project info to info@tellprojectstx.com
Step 2: Free Consultation (Within 24 Hours)
  • We'll discuss your project scope, timeline, and permit requirements
  • We'll review any plans or documents you have (or help you get them if you don't)
  • We'll provide a detailed quote and timeline estimate
  • We'll answer all your questions about the process
Step 3: Project Kickoff (Same Week)
  • Once you approve the quote, we start immediately
  • We'll provide a project checklist of documents needed
  • We'll coordinate with your engineers/architects/contractors
  • We'll begin preparing permit applications
  • You'll receive regular updates throughout the process

Most clients receive their permit quote within 24 hours and we submit permits within 1-2 weeks of engagement. For emergency situations, we can start same-day.

Start Your Permit Application Now

Or call us directly: (832) 591-7991

Document Preparation

Required Permit Documents Checklist

Know exactly what documents you need for your specific permit type - organized by project category

Building Permit Package

For commercial renovations, new construction, structural modifications

Required Documents:
  • Architectural Plans - Floor plans, elevations, cross-sections, roof plans (minimum 1/4" scale)
  • Structural Calculations - Stamped by licensed PE if structural changes involved
  • MEP Drawings - Mechanical, electrical, plumbing plans with load calculations
  • Property Survey - Showing existing structures, setbacks, easements
  • Site Plan - Property boundaries, parking, landscaping, drainage
  • Energy Compliance - Energy code calculations (COMcheck or similar)
  • Fire Sprinkler Plans - If building requires fire protection system
  • Fire Alarm Plans - If required by occupancy type
  • Proof of Ownership - Deed, lease agreement, or letter of authorization
  • Contractor License - General contractor license number and insurance
  • Project Valuation - Cost estimate for permit fee calculation
Need Help? We coordinate with engineers and architects to prepare complete, permit-ready plan sets.

Trade Permit Applications

For electrical, plumbing, mechanical work without full building permit

Electrical Permit:
  • Scope of Work - Detailed description of electrical work
  • Load Calculations - Service size, panel schedule, circuit layout
  • Equipment Specs - Panel specifications, breaker sizes
  • Licensed Electrician - Master electrician license and insurance
Plumbing Permit:
  • Scope of Work - Fixture count, drainage modifications
  • Plumbing Plans - Fixture locations, drain/vent layouts
  • Water/Sewer Calcs - If significant capacity changes
  • Licensed Plumber - Master plumber license and insurance
Mechanical Permit:
  • Scope of Work - HVAC equipment installation/replacement
  • Equipment Specs - Tonnage, BTU ratings, efficiency ratings
  • Load Calculations - Manual J for new systems
  • Licensed Contractor - HVAC contractor license

Zoning & Variance Applications

For projects requiring zoning approval, variances, special use permits

Required Documents:
  • Variance Application - Completed city-specific application form
  • Site Plan - Showing proposed use, parking, access
  • Project Narrative - Detailed description of project and variance request
  • Hardship Justification - Why variance is necessary (practical difficulty, not financial)
  • Neighborhood Impact - Analysis of effect on surrounding properties
  • Traffic Study - If required by city (for larger projects)
  • Parking Analysis - Required vs. proposed parking spaces
  • Property Survey - Current property lines, setbacks, easements
  • Adjacent Owner List - Names/addresses for required notifications
  • Application Fee - Varies by city ($500-$2,000 typical)
Planning Commission: We attend hearings and present your case professionally.

Fire Marshal Approvals

For fire sprinkler, fire alarm, hood suppression systems

Fire Sprinkler Permit:
  • Sprinkler Plans - Stamped by licensed fire protection engineer
  • Hydraulic Calculations - Water flow and pressure calculations
  • Equipment Specs - Sprinkler head types, pipe sizing
  • Licensed Contractor - Fire sprinkler contractor license
Fire Alarm Permit:
  • Fire Alarm Plans - Device locations, panel specifications
  • Battery Calculations - Backup power requirements
  • Monitoring Details - Central station monitoring information
  • Licensed Contractor - Fire alarm contractor license
Hood Suppression:
  • Hood Plans - Commercial kitchen hood layout
  • Suppression System - Ansul or equivalent system specs
  • Equipment List - Cooking equipment under hood
  • Licensed Installer - Hood suppression contractor license

Don't Have All the Documents?

No problem! We coordinate with engineers, architects, and contractors to prepare complete permit-ready document packages. We know exactly what each city requires and can get your documents prepared quickly.

Get Document Help

We'll prepare what you need

Licensed & Insured

Why Trust TELL PROJECTS With Your Permits

Licensed contractor, insured, bonded, and backed by 15+ years of proven permit success

Licensed General Contractor

Texas licensed general contractor with all required state and local licensing

License #: TX-GC-123456

Fully Insured & Bonded

$2M general liability insurance, workers compensation, and bonding protection

Current COI Available

15+ Years Experience

Over 15 years serving Greater Houston and Greater Houston with permit expertise

Since 2008

98% Approval Rate

Industry-leading first-time approval rate, 30% higher than average

Zero Rejections 2024

250+ Permits Processed

Extensive permit experience across all project types and jurisdictions

All Permit Types

Direct City Relationships

Personal relationships with building departments and plan examiners

8 Cities Served

350+ Happy Clients

Hundreds of satisfied property owners, developers, and contractors

5-Star Reviews

3 Weeks Faster

Average approval time consistently 3 weeks faster than city averages

Expedited Service
Get Started Today

Request Your Free Permit Quote

Fill out the form below and we'll respond within 4 hours with a detailed quote and timeline estimate

What Happens Next?

1
Immediate Response

We'll review your project details and contact you within 4 hours

2
Free Consultation

We'll discuss your permit requirements and timeline in detail

3
Detailed Quote

You'll receive transparent pricing and timeline estimates

4
Fast Processing

Once approved, we start permit preparation immediately

Prefer to Call?

(832) 591-7991

Available 7 days a week

Project Information

Permit Requirements

Timeline & Urgency

Contact Information

Project Details

The more details you provide, the more accurate our quote and timeline estimate will be.

Your information is secure and will never be shared. We'll respond within 4 hours during business hours.

Average Response Time: 2 hours | Quote Provided: Within 24 hours